Bathroom Remodeling Project

Full Renovation of Two BathroomsGrace and Pat in Palos Verdes

#bathroomremodeling #PalosVerdes #SouthBay

01
We help you choose

Project Story – Why Bathroom Remodeling Was Needed

Grace and Pat, homeowners in Palos Verdes, contacted us for a bathroom remodeling project involving two bathrooms in their home. Both spaces had serious issues with flooring and walls, and they also wanted modern furniture and fixtures.

The old natural stone floors were cracking due to a weak substructure, and the layout no longer met their needs. Our team redesigned and reinforced the structure, rebuilt one shower completely, and updated the second bathroom with a new floor, furniture, a large mirror, and recessed medicine cabinets.

This project shows how professional bathroom remodeling can solve structural issues while transforming outdated spaces into modern, stylish, and functional rooms.

Request a call!


    02
    Bathroom INSPIRATION

    Technical Features of the Bathroom Renovation

    Bathroom remodeling often reveals hidden damage. In this case, we found:

    To ensure a lasting solution, we repaired the framing, installed new cement board subfloors, and applied a three-layer liquid waterproof membrane. These steps guarantee durability and protection against future water damage — an essential part of high-quality bathroom remodeling.

    03

    Key Facts & Figures

    Scope: Bathroom remodeling of two bathrooms

    Bathroom 1 – 60 sq. ft

    New tile shower with mosaic, new flooring, updated furniture, reinforced walls, relocated lighting, new medicine cabinets, new valves, and a modern shower set.

    Bathroom 2 – 50 sq. ft

    New flooring, updated furniture, fresh walls, relocated lighting, and new medicine cabinets.

    Appointment for assessment!


      04
      Inspiration Gallery

      Photos of the facility after renovation

      3 ╨Ф╨Ю3 ╨Я╨Ю╨б╨Ы╨Х
      2 ╨Ф╨Ю2 ╨Я╨Ю╨б╨Ы╨Х
      1 ╨Ф╨Ю1 ╨Я╨Ю╨б╨Ы╨Х

      PROJECT RECAP

      • Materials: Wood-look porcelain tile flooring; ceramic tile & mosaic shower; custom fiberglass shower pan.
      • Labor Cost: $15,000–20,000
      • Materials & Furniture: $6,000–8,000
      • Duration: 3 weeks

      How to Start Your Bathroom Remodeling Project

      Thinking about a bathroom remodel? The most challenging part for homeowners is choosing the right design and materials. We take care of everything else — from structural work to the final finishes — always in full compliance with building codes.

      With our expertise, every bathroom remodeling project is delivered with precision, durability, and style.

      Drop us a line

      We are professionals at staying on budget, and completing projects on time.


        Get In Touch

        541 Melville Ave, Palo Alto, CA 94301,

        Email.Exemple@gmail.com

        Phone:  +012.345.6789

        Work Inquiries

        Email.Exemple@gmail.com

        Phone: +012.345.6789